ABB HVC 200 - Transport, handling and unpacking; Transport the EVSE to the site

ABB HVC 200
92 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3.3.4 AC plate..................................................................................................................... 24
3.3.5 DC plate.....................................................................................................................25
3.3.6 Cable glands in the power cabinet...................................................................... 26
3.4 Control elements......................................................................................................................27
3.4.1 LED indicators..........................................................................................................27
3.5 Power allocation strategies...................................................................................................28
3.5.1 Static allocation.......................................................................................................28
3.5.2 Dynamic allocation................................................................................................. 28
3.6 Options......................................................................................................................................29
3.6.1 Emergency stop button (EMO)............................................................................ 29
4 Transport, handling and unpacking................................................ 31
4.1 Transport the EVSE to the site..............................................................................................31
4.1.1 Hoist the packaged cabinet.................................................................................. 31
4.1.2 Move the packaged cabinet with a forklift truck..............................................32
4.2 Unpacking................................................................................................................................. 33
4.2.1 Unpacking procedure............................................................................................. 33
4.2.2 Do a check of the transport sensors...................................................................33
5 Pre-installation.................................................................................. 35
5.1 Prepare the site........................................................................................................................35
5.2 Control the space and airflow around the EVSE................................................................36
5.3 Install the cable ducts.............................................................................................................36
5.4 Prepare the foundation.......................................................................................................... 36
5.4.1 Prepare a foundation - general procedure......................................................... 36
5.4.2 Prepare the foundation for the power cabinet (concrete)..............................37
5.4.3 Prepare a metal foundation for the power cabinet.......................................... 37
5.4.4 Install the cable gland plate for the concrete foundation of the power
cabinet...................................................................................................................... 38
6 Installation......................................................................................... 39
6.1 Install the power cabinet - general procedure...................................................................39
6.2 Mechanical installation...........................................................................................................39
6.2.1 Mechanical installation of the power cabinet - general procedure...............39
6.2.2 Install the cabinet on the foundation..................................................................39
6.2.3 Install the cover plates of the metal foundation.............................................. 40
6.3 Electrical installation...............................................................................................................41
6.3.1 Electrical installation of the power cabinet - general procedure.................. 41
6.3.2 Connect the PE wire of the AC input cable........................................................ 42
6.3.3 Connect the AC input wires.................................................................................. 42
6.3.4 Connect the AC auxiliary power cable (3 phase 480 V) in the power
cabinet...................................................................................................................... 43