6.3.5 Connect the AC auxiliary power cable (1 phase 120 V) in the power
cabinet...................................................................................................................... 45
6.3.6 Connect the DC power cables.............................................................................. 46
6.3.7 Connect the DC auxiliary power cables (24 V) to the power cabinet........... 47
6.3.8 Connect the interlock and DC guard cables to the power cabinet...............48
6.3.9 Connect the Ethernet output cables to the power cabinet............................ 51
6.3.10 Connect the optical fiber cables (Ethernet to fiber)........................................52
6.3.11 Connect the optical fiber cables (CAN to fiber)................................................52
6.3.12 Installation procedure for the the long distance kit (optional)..................... 53
6.3.13 Disconnect the ethernet cable from the converter..........................................53
6.3.14 Connect the ethernet cable to the connector...................................................54
6.3.15 Connect the EMO cable to the power cabinet (optional)............................... 55
6.3.16 Install a ferrule on a wire....................................................................................... 56
6.3.17 Connect a wire that has a ferrule......................................................................... 57
6.4 Precommissioning mode....................................................................................................... 57
6.4.1 General information................................................................................................57
6.4.2 Precommissioning mode - general procedure..................................................58
6.4.3 Do an inspection of the PE connection.............................................................. 59
6.4.4 Connect the 120 V cable for the precommissioning mode.............................59
6.4.5 Do a check on the electrical parts....................................................................... 60
6.4.6 Set the precommissioning switch.......................................................................60
7 Commissioning.................................................................................. 61
7.1 Precommissioning mode........................................................................................................61
7.1.1 Do a check on the status of the precommisioning mode............................... 61
7.1.2 General procedure...................................................................................................61
7.1.3 Set the precommissioning switch....................................................................... 61
7.1.4 Remove the 120 V cable for the precommissioning mode..............................62
7.2 Prepare for commissioning................................................................................................... 62
8 Operation........................................................................................... 64
8.1 Prepare before use..................................................................................................................64
8.2 Emergency stop.......................................................................................................................64
8.3 Reset the EVSE after an emergency stop........................................................................... 64
8.4 Charge session.........................................................................................................................65
8.4.1 Charge an EV............................................................................................................65
8.4.2 Start a charge session........................................................................................... 65
8.4.3 Stop a charge session............................................................................................ 65
9 Maintenance and cleaning................................................................66
9.1 Maintenance schedule............................................................................................................ 66
9.2 Do a check on the cabinet..................................................................................................... 66
9.3 Clean the EVSE......................................................................................................................... 66
Contents
HVC 200/300/360-EN | 002 5