The suitability of the IED’s binary outputs which have been selected for primary
device control should be carefully verified, for example make and carry and breaking
capacity. If the requirements for the primary device control circuit are not met, using
external auxiliary relays should be considered.
Section 3 1MRS756378 S
REF615 standard configurations
42 REF615
Application Manual