73
the fundamental frequency and performs unbalance analysis for voltage and
current. Sequence components are shown in Fig 4-4, unbalance of voltage and
current are shown in Fig 4-1.
Fig 4-4 Sequence component and Phase angle
4.4 Over/Under Limit Alarming
Acuvim II series meter has over/under limit alarming capabilites. When the
monitored parameter goes over/under the preset limit and stays at the level
over the preset amount of time delay, the over/under limit alarm will be
triggered. The over/under limit value and its time stamp will be recorded in the

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the AccuEnergy Acuvim II series and is the answer not in the manual?

AccuEnergy Acuvim II series Specifications

General IconGeneral
BrandAccuEnergy
ModelAcuvim II series
CategoryMeasuring Instruments
LanguageEnglish

Related product manuals