CHAPTER
7
S
ITE
A
NALYSIS
G
UIDES
N
OTE
:
These site analyses include rudimentary connection diagrams for identification
of metering installation. These diagrams are not metering installation guides.
The phasor diagrams are shown for informational purposes only. The meter does
not provide the information necessary to determine the phase relationships
between voltages and currents.
I
MPORTANT
Actual installation procedures, materials, equipment, and connections must
conform to applicable codes and standards.
Form 2W-1ф 3W-1ф 3W-N
1S 32 - -
2S - 33 -
3S 34 35 -
4S - 36 -
12S - 37 38
25S - - 39