Adjustments
Procedure References
This
section
provides
supplemental
information for
the adjustments
which are
performed by
the
program.
Connection
instructions
and some
additional explanations
are provided.
Use this
chapter
as
a
reference
when performing
the adjustments
.
A
adjustment
of
the
4263B
consists
of
the
following ve
adjustments.
Signal
Source
Level
A
djustment
Impedance
Measurement
0m
A
djustment
Impedance
Measurement
1m
A
djustment
Impedance
Measurement
2m
A
djustment
Impedance
Measurement
4m
A
djustment
Signal
Source
Level
A
djustment
This
adjustment
updates
the
signal
source
level
adjustment
data
stored
in
the
EEPROM.
The
data
adjust
the
actual
signal
source
level
to
the
set
value
.
Equipment
Multimeter
3458A
Dual
Banana-BNC(m)
Cable
PN
11001-60001
Setup
This
setup
obtains
the
signal
source
level
adjustment
data.
Figure 2-2. Signal Source Level Adjustment Setup
Perform the following steps as the program instructs.
1. Connect the Dual Banana-BNC(m) cable to the 3458A's INPUT binding posts.
2. Connect another end of the Dual Banana-BNC(m) cable to the 4263B 's H
CUR
Connector.
Adjustments 2-7