Component Installation and Disassembly Procedures
6-3
Measure each length of branch cable and order the appropriate
branch cable spools. Refer to page 8-11 for spool sizes and related
part numbers. Consider service loops — order 10% longer cable
lengths. NO SPLICING — BRANCH CABLE RUNS MUST BE
CONTINUOUS.
Prepare the sites:
Ensure sites conform to environmental specifications.
Install AC power receptacles within 1.8 m (6 ft.) of instruments
connected to the SDN, and install AC power receptacles within
1.5 m (5 ft.) of the ACC.
Install wall mounts, consoles, etc. for mounting monitoring and
display instruments.
Supply and install branch cable enclosures (conduit, troughs,
raceways, etc.) when necessary.
Supply and install NEMA switch wall boxes near each instrument (2
3/4-inch depth minimum with conduit knockouts).
Receive and store equipment and instruments.
Install and test UTP cable using Category 5 rules with AMP 110 edge
connectors.
Supply a standard 19" telecommunications rack or:
Mount a plywood panel 40.6 cm wide x 50.8 cm high x 1.9 cm deep,
minimum (16 in. W x 20 in. H x 3/4 in. D) to wall surface at the
chosen ACC site location. DO NOT MOUNT ACC TO WALL
SURFACE.
Install branch cables from plywood panel (ACC site location) to the
switch wall boxes. Leave at least a 4-foot service loop at the plywood
panel (ACC).
Supply certification of Category 5 UTP installation to Agilent
installer.
Ensure cable installation conforms to local building codes.
Schedule Agilent Technologies service personnel to interconnect
parts and instruments of the SDN.
Schedule key operator training for SDN system operation.
Agilent Installation Responsibilities
Assist customer in planning system configuration.
Inspect each instrument site for conformance to environmental
specifications and service access requirements.
Supply system distribution branch cables, connectors, and
faceplates.
Mount the ACC to the plywood panel or rack mount.
Connect branch cables to each wall box.
Connect branch cables to the ACC.
Install the instruments.
Connect the instruments to the SDN.
Perform comprehensive system verification procedures.
Train key operators to ensure proper SDN system operation.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Agilent Technologies 78581B and is the answer not in the manual?

Agilent Technologies 78581B Specifications

General IconGeneral
BrandAgilent Technologies
Model78581B
CategoryController
LanguageEnglish

Related product manuals