Installation
8-19
Serial Communication Controller (SCC) Procedures (78581A)
The following procedures describe the detailed steps for installing a Serial
Distribution Network (SDN) between an instrument wall box and the
Serial Communication Controller (SCC) using UTP cable. Procedures for
connecting the SCC to a patch panel are given for both RJ 45 and 110
punch-down type systems.
Agilent recommends that these steps be performed by a licensed LAN
installer who will certify the terminated UTP cable.
Agilent is responsible for the following steps:
1. Qualify UTP cable
2. Complete wall box installation
3. Wire patch cable to SCC
4. Connect patch cable to patch panel
5. Perform final operational check
Terminate UTP Cable at
Patch Panel
1. Locate SCC.
2. Locate SCC patch panel for new installation.
Patch panel must be within 8 feet of the SCC.
3. Determine if UTP cable been terminated at patch panel.
• If YES, proceed to next section, “Terminate UTP Cable at Wall
Box.”
• If NO, terminate patch panel as follows.
4. Terminate UTP cable at patch panel.
a. Strip back UTP cable insulation no more than 2 inches, keeping
twists in wire pairs within 0.5 inch of termination at patch panel.
b. Lay twisted cable over patch panel punch-down connectors.
c. Using punch tool, punch wires following color code on rear of patch
panel. For ease of installation, start wiring patch panel at lowest
port and proceed to highest port.
Refer to the following diagram for UTP cable color coding and proper wire
connection.