Chapter 2: Installation
Required Materials
Page 9
Warning. Work on the electric board only after verifying prime power is disconnected. Do not apply power to
the machine with the covers removed.
Important. Before carrying out inspections, maintenance operations, and safety checks, follow all accident-
prevention standards such as wearing goggles, gloves, and an appropriate uniform.
Required Materials
AIRSYS Supplied Materials
Table 4 lists all the material supplied by AIRSYS. After opening the package, verify that all items are accounted for.
If any material is missing, please contact an AIRSYS distribution center using the following information:
Tempest Telecom Solutions, LLC
Web: http://tempesthvac.com/
Email: HVACSupport@tempesttelecom.com
Phone: 805-879-5432
Table 4: Material Supplied by AIRSYS
Wall Pack Unit Assembly: Two per Shelter
Example:
M-OD.13E1C3DR410.230/1/60.AC
refer to Table 2: Model Number
Nomenclature
Only included for models 3/5R1C1
Only included for models 7/9E1C2
Only included for models 13E1C3
Only included for models 18E1C4
Self-tapping screw ST4.2*25
For the supply and return air grill installation
Controller Box Assembly: One per Shelter
Model: ASLLC.2 or ASLLC.2.48
Indoor temperature sensor
One end connected inside the controller box
Backup Indoor temperature
sensor
One end connected inside the controller box
Outdoor temperature sensor
One end connected inside the controller box
One end connected inside the controller box
For housing outdoor temperature sensor and
mounting on outside wall
Installation and Operation
Manual
Must be returned according to instructions
on page 39