EasyManua.ls Logo

Alcatel-Lucent OmniSwitch 6850E Series - Page 134

Alcatel-Lucent OmniSwitch 6850E Series
182 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Roles Within the Stack Managing OmniSwitch 6850E Series Stacks
page 6-6 OmniSwitch 6850E Series Hardware Users Guide January 2013
Redundant Management Module Failover (Two Switches)
Primary
Secondary
Secondary
Offline
Primary
Offline
Secondary
Primary
!
A stack of two switches is operating normally. The
stack consists of a primary module and a secondary
module. (The software on both elements in the stack is
synchronized.)
The primary management module fails or is taken
offline (e.g., powered off or rebooted by the user).
The switch operating as the secondary management module
immediately takes over the primary role. It is at this point
essentially operating as a stand-alone switch.
If the switch that previously failed or was taken offline
comes back online, it will assume the secondary role in the
stack.
1
2
3
4

Table of Contents

Related product manuals