Regulatory Compliance and Safety Information NEBS Compliance Statements
OmniSwitch 6850E Hardware Users Guide January 2013 page A-5
Environmental Standards
• ETS 300 019 Storage Class 1.1
• ETS 300 019 Transportation Class 2.3
• ETS 300 019 Stationary Use Class 3.1
NEBS Compliance Statements
The following statements apply to OS6850E non-PoE models OS6850E-24, OS6850E-24X, OS6850E-48,
OS6850E-48X and OS6850E-U24X.
Intended Installation Locations
• Network telecommunications facilities
• Customer premises
• Installation must be in a location where a Surge Protective Device (SPD) is used for the AC power
service entrance.
Battery Return Configuration
The Battery Return (BR) configuration will be either Isolated dc return (DC-I) or
Common dc return (DC-C)
Note. The ampacity of the conductor connecting the equipment frame to the BR conductor shall be equal
to or greater than the ampacity of the associated BR conductor.
Equipment Grounding
For grounding, use Panduit Lug:
Installation is suitable as part of the Common Bonding Network (CBN).
Panduit P/N: LCD8-10A-L
Copper Conductor Size: 8 AWG
Screw Size: 10-32 (Thread Size)
Torque: 25.0 +/- 2.0 (inch lb)