Rockwell Automation Publication 6000-IN100A-EN-P - August 2020 19
Chapter 1 Drive Mechanical Installation
For condition 1, 215 A seismic installation, follow these instructions:
1. Open MV front door and back door.
2. Remove the JC front barrier.
3. Remove the back horizontal baffles and all seismic covers.
4. Drill anchor holes at the front of the cabinet.
5. Drill anchor holes at the back of the cabinet.
6. Install all the removed parts in reverse order of removal.