EasyManua.ls Logo

Alliance Laundry Systems CHD25G2-CA025L - Ferrite Ring Installation (025, 030, 035 and 055 Series Only)

Alliance Laundry Systems CHD25G2-CA025L
136 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Electrical Requirements
Part No. 70458301ENR7
©
Copyright, Alliance Laundry Systems LLC - DO NOT COPY or TRANSMIT 83
If serial plate voltage is: Tumble Dryer can be converted to the following voltages:
200-220 Volt/60 Hertz/1 Phase
200 Volt/50 Hertz/1 Phase
2W&G
(All models except T45)
100 Volt/60 Hertz/1 Phase INTERNATIONAL Models:
2W&G
100 Volt/50 Hertz/1 Phase INTERNATIONAL Models:
2W&G
1. Prior to connecting electric service, locate transformer
configuration jumper in junction box area.
2. Remove the 208 Volt jumper and replace it with the 100
Volt jumper located in the literature packet from cylinder.
3. Remove small access cover from back of the fan motor.
Locate the two internal jumper wires, brown and blue
connected to motor terminals #6 and #2. Move brown
wire from terminal #6 to terminal #2 and blue wire from
terminal #2 to terminal #4. Be careful not to confuse
light blue motor harness wire with the dark blue internal
jumper.
4. Carefully check motor wire connections with wiring
diagram and verify that the motors are configured for low
voltage operation before replacing covers.
5. Sign and date conversion sticker located on back of
tumble dryer.
6. Follow the instructions covered in Connecting Electrical
Service section.
380 Volt/50 Hertz/3 Phase
3W&G
(All models except T45)
400-415 Volt/50 Hertz/3 Phase Models:
3W&G
1. Prior to connecting electric service, locate transformer
configuration jumper in junction box area.
2. Remove the 380 Volt jumper and replace it with the 415
Volt jumper located in the literature packet from cylinder.
3. Sign and date conversion sticker located on back of
tumble dryer.
4. Follow the instructions covered in Connecting Electrical
Service section.
Ferrite Ring Installation (025, 030, 035 and 055 Series Only)
Gas and Steam Models with OM Control Suffix Only (Models Through 7/31/11)
The ferrite ring provided in the literature packet must be installed over the power leads during connection of electrical
service. The ferrite protects the sensitive electronic controls from destructive electrical disturbances which may be present
on power lines to the machine. Failure to properly install the ferrite ring may result in damage to the electronic controls
and will void control warranty.
To install:
1. Immediately after connection of power leads and before
applying power to machine, locate each of the incoming
service leads including ground.
2. Snap the ferrite ring closed over all the service leads inside
of the contactor box as shown. It is important that the ferrite
ring be installed inside the contactor box. Refer to Figure
26 . Do not install the ferrite outside of the box or other
area. Make sure that service leads are in the center of the

Table of Contents

Related product manuals