EasyManua.ls Logo

Allied Telesis GS950 PS V2 Series - Beginning the Installation; Required Items; Switch Orientations in the Equipment Rack; Figure 21: Switch Orientations in an Equipment Rack

Allied Telesis GS950 PS V2 Series
108 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter 4: Installing the Switch in an Equipment Rack
52
Beginning the Installation
This chapter contains the procedure for installing the switch in a standard
19-inch equipment rack, with the brackets included with the unit.
Required Items The following items are required to install the switch in an equipment rack:
Two equipment rack brackets (included with the switch)
Eight M4x6mm bracket screws (included with the switch)
Cross-head screwdriver (not provided)
Four standard equipment rack screws (not provided)
Switch
Orientations in
the Equipment
Rack
You can install the switch with its front panel flush with or extending in
front of the equipment rack. The illustrations in Figure 21 on page 52 show
the two switch orientations in the equipment rack.
Figure 21. Switch Orientations in an Equipment Rack

Table of Contents

Related product manuals