79
Figure 40. Installing an SFP Transceiver
Note
If you are ready to attach the fiber optic cable to the transceiver,
continue with the next step. Otherwise, repeat steps 1 to 3 to install
another SFP transceiver in the switch.
4. Remove the dust cover from the transceiver, as shown in Figure 41.
Figure 41. Removing the Dust Cover from an SFP Transceiver