GS950 PS V2 Series of Gigabit Ethernet PoE+ Switches Installation Guide
83
2. Raise the retaining clip. Refer to Figure 45.
Figure 45. Raising the Retaining Clip
3. Connect the power cord to the connector. Refer to Figure 46.
Figure 46. Plugging in the AC Power Cord
4. Lower the retaining clip to secure the power cord to the switch. Refer
to Figure 47 on page 84.