EasyManua.ls Logo

Allied Telesis GS950 PS V2 Series - Figure 30: Installing the Brackets to the Switch for Wall Installation

Allied Telesis GS950 PS V2 Series
108 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter 5: Installing the Switch on a Wall
66
Figure 30. Installing the Brackets to the Switch for Wall Installation
3. After attaching the brackets to the side of the switch, have another
person hold the switch on the plywood base on the wall while you
secure it with the four provided screws. Refer to Figure 31 on page 67.
Please follow these guidelines as you position the switch on the wall:
Position the switch so that the front panel is facing up or down.
Refer to Figure 24 on page 56. Do not install the switch with the
front panel facing right or left.
Leave sufficient space from other devices or walls so that you can
access the front and back panels. Refer to “Recommended
Minimum Reserved Wall Area” on page 59.
4. Go to Chapter 6, “Cabling the Networking Ports” on page 75.

Table of Contents

Related product manuals