EasyManua.ls Logo

Allied Telesis GS950 PS V2 Series - Installing the GS950;52 PS V2 Switch on a Wall; Figure 34: BRKT-J22 Brackets Kit; Figure 35: Wall Installation of the GS950;52 PS V2 Switch with BRKT-J22 Brackets

Allied Telesis GS950 PS V2 Series
108 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GS950 PS V2 Series of Gigabit Ethernet PoE+ Switches Installation Guide
71
Installing the GS950/52PS V2 Switch on a Wall
For wall installations of the GS950/52PS V2 Switch, Allied Telesis
recommends the optional BRKT-J22 Brackets kit. The kit consists of four
identical brackets, shown in Figure 34.
Figure 34. BRKT-J22 Brackets Kit
Figure 35 illustrates the correct orientation of the GS950/52PS V2 Switch
and BRKT-J22 Brackets on a wall. The front panel has to face up and the
bottom panel has to be against the wall.
Figure 35. Wall Installation of the GS950/52PS V2 Switch with BRKT-J22
Brackets

Table of Contents

Related product manuals