EasyManua.ls Logo

Allied Telesis GS950 PS V2 Series - Figure 37: Attaching the Bottom BRKT-J22 Brackets to the Wall; Figure 38: Sliding the Switch into the Bottom BRKT-J22 Brackets

Allied Telesis GS950 PS V2 Series
108 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GS950 PS V2 Series of Gigabit Ethernet PoE+ Switches Installation Guide
73
Figure 37. Attaching the Bottom BRKT-J22 Brackets to the Wall
7. Slide the bottom panel of the switch into the brackets. Refer to
Figure 38.
Figure 38. Sliding the Switch into the Bottom BRKT-J22 Brackets
Flange
Flange

Table of Contents

Related product manuals