EasyManua.ls Logo

Allied Telesis GS950 PS V2 Series - Page 9

Allied Telesis GS950 PS V2 Series
108 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
9
Figure 1: Front Panel of the GS950/10PS V2 Switch...........................................................................................................18
Figure 2: Front Panel of the GS950/18PS V2 Switch...........................................................................................................18
Figure 3: Front Panel of the GS950/28PS V2 Switch...........................................................................................................19
Figure 4: Front Panel of the GS950/52PS V2 Switch...........................................................................................................19
Figure 5: Back Panel of the GS950/10PS V2 Switch ...........................................................................................................19
Figure 6: Back Panel of the GS950/18PS V2 and GS950/28PS V2 Switches .....................................................................20
Figure 7: Back Panel of the GS950/52PS V2 Switch ...........................................................................................................20
Figure 8: PoE MAX LED.......................................................................................................................................................30
Figure 9: POWER LED.........................................................................................................................................................31
Figure 10: Link/Activity and PoE LEDS for the Copper Ports on the GS950/28PS V2 Switch.............................................32
Figure 11: Link/Activity and PoE LEDS for Copper Ports 1 to 24 on the GS950/52PS V2 Switch.......................................32
Figure 12: Link/Activity LEDS for Copper Ports 25 to 48 on the GS950/52PS V2 Switch....................................................33
Figure 13: LEDs for the SFP Ports on the GS950/28PS V2 Switch .....................................................................................34
Figure 14: LEDs for the SFP Ports on the GS950/52PS V2 Switch .....................................................................................35
Figure 15: eco-Friendly Button .............................................................................................................................................36
Figure 16: Airflow..................................................................................................................................................................38
Figure 17: Installation Options..............................................................................................................................................45
Figure 18: Package Contents...............................................................................................................................................47
Figure 19: Equipment Rack/Wall Brackets ...........................................................................................................................48
Figure 20: Affixing the Bumper Feet.....................................................................................................................................50
Figure 21: Switch Orientations in an Equipment Rack .........................................................................................................52
Figure 22: Attaching the Equipment Rack Brackets.............................................................................................................54
Figure 23: Installing the Switch in an Equipment Rack.........................................................................................................54
Figure 24: Wall Installations..................................................................................................................................................56
Figure 25: Unsupported Switch Orientations on a Wall........................................................................................................57
Figure 26: Recommended Minimum Reserved Wall Area with the Front Panel Facing Up .................................................59
Figure 27: Recommended Minimum Reserved Wall Area with the Front Panel Facing Down.............................................60
Figure 28: Switch on a Wall with a Plywood Base................................................................................................................61
Figure 29: Steps to Installing the Switch with a Plywood Base ............................................................................................62
Figure 30: Installing the Brackets to the Switch for Wall Installation ....................................................................................66
Figure 31: Attaching the Switch to the Plywood Base ..........................................................................................................67
Figure 32: Marking the Locations of the Bracket Holes on a Concrete Wall .......................................................
.................69
Figure 33: Installing the Switch on a Concrete Wall .............................................................................................................70
Figure 34: BRKT-J22 Brackets Kit........................................................................................................................................71
Figure 35: Wall Installation of the GS950/52PS V2 Switch with BRKT-J22 Brackets ..........................................................71
Figure 36: Marking the Screw Holes for the BRKT-J22 Brackets.........................................................................................72
Figure 37: Attaching the Bottom BRKT-J22 Brackets to the Wall.........................................................................................73
Figure 38: Sliding the Switch into the Bottom BRKT-J22 Brackets ......................................................................................73
Figure 39: Attaching the Top BRKT-J22 Brackets to the Wall..............................................................................................74
Figure 40: Installing an SFP Transceiver..............................................................................................................................79
Figure 41: Removing the Dust Cover from an SFP Transceiver ..........................................................................................79
Figure 42: Positioning the SFP Handle in the Upright Position ............................................................................................80
Figure 43: Connecting a Fiber Optic Cable to an SFP Transceiver......................................................................................80
Figure 44: Installing the Retaining Clip.................................................................................................................................82
Figure 45: Raising the Retaining Clip...................................................................................................................................83
Figure 46: Plugging in the AC Power Cord...........................................................................................................................83
Figure 47: Lowering the Retaining Clip.................................................................................................................................84
Figure 48: Connecting the Power Cord to an AC Power Source..........................................................................................84
Figure 49: Login Window......................................................................................................................................................86
Figures

Table of Contents

Related product manuals