Use of the implement
264
Cirrus 03 BAH0101-05 11.19
10.4.4 Filling auger for folding implements
10.4.4.1 Move the filling auger into the filling position
1. Couple the implement and the tractor.
During seeding work and for transporting,
the filling auger (Fig. 386/1) rests against
the closed opening of the hopper.
Fig. 386
2. Instruct people to leave the swivel area of
the implement booms.
3. Unfold the implement sections into working
position (see section "Use of the imple-
ment“, page 240) and lower the implement
via the integrated running gear.
4. Apply the tractor parking brake.
Fig. 387
5. Direct people out of the swivel area of the
filling auger.
6. Apply pressure to tractor control unit
(beige).
7. Unfold the filling auger completely.
7.1 Press the lever (Fig. 388/1) down.
Fig. 388