EasyManuals Logo

Amazone Cirrus 03 User Manual

Amazone Cirrus 03
368 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #90 background imageLoading...
Page #90 background image
Structure and function
90
Cirrus 03 BAH0101-05 11.19
5.14.5 Cirrus (-CC)(-2CC) with two metering units and two distributor heads
Cirrus-CC with two metering units and
two distributor heads have
ï‚· 2 chambers in the hopper
ï‚· 1 metering unit at the front (Fig. 98/1)
ï‚· 1 metering unit at the rear (Fig. 98/2)
for FerTeC coulters
ï‚· 2 double sluices (Fig. 98/3)
ï‚· 1 distributor head (Fig. 98/1a)
for RoTeC pro Control coulters or
TwinTeC+ double disc coulters
ï‚· 1 distributor head (Fig. 98/2a)
for FerTeC coulters.
Fig. 98
The calibration is performed consecutively on
both metering units. The order of the numbered
metering units can be freely selected.
Metering unit at the front (Fig. 98/1)
When calibrating the spread rate and during
operation
ï‚· the seed flows out of the front hopper
chamber into the left conveyor tube to the
seed distributor head (Fig. 98/1a)
ï‚· the seed rate is not halved during
calibration.
Fig. 99
Metering unit at the rear (Fig. 98/2)
When calibrating the spread rate and during
operation
ï‚· the metered material flows out of the rear
hopper chamber into the right conveyor tube
to the FerTeC distributor head (Fig. 98/2a)
ï‚· the metered quantity is not halved during
calibration.
Fig. 100

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Amazone Cirrus 03 and is the answer not in the manual?

Amazone Cirrus 03 Specifications

General IconGeneral
BrandAmazone
ModelCirrus 03
CategoryFarm Equipment
LanguageEnglish

Related product manuals