9 Commissioning
(continued)
9-10
C232-302-401/402/403/404-603 / C232/EN M/A23
Completion of
commissioning
Before the C232 is released for operation, the user should make sure that the following
steps have been taken:
All memories have been reset.
(Reset at MAIN: General reset (password-protected) and MT_RC: Reset
recording, both in 'Oper/CtrlTest/ folder.)
Blocking of output relays has been canceled.
(OUTP: Outp.rel.block USER in 'Par/Func/Glob/' folder, setting 'No')
Blocking of the trip command has been canceled.
(MAIN: Trip cmd.block.USER, 'Par/Func/Glob/' folder, setting 'No')
The C232device is on-line.
(MAIN: Device on-line, 'Par/Func/Glob/' folder, setting 'Yes (on)')
The residual current stages of the protection functions are enabled (on).
(MAIN: Syst.IN enabled USER ,'Par/Func/Gen/' folder, setting 'Yes (on)')
The correct control point – Local or Remote – is activated.
The desired interlocking conditions are activated.
After completion of commissioning, only the green LED indicator signaling ‘Operation’
(H1) should be on.