installation &
operating instructions
Design Envelope 4322 & 4372
Tango Pumping Unit
34
For buildings that are commissioned in multiple stages, or
where the design flow changes each time, the Auto Flow
Balancing function can be run at the beginning of each stage.
From the touch screen, go to Pump Configuration -> Auto
Flow Balancing, then follow the on-screen instructions. The
Auto Flow Balancing scan takes approximately 3 minutes to
complete.
4.3 touch screen
4.3.1 login
Default Password 1234
4.3.2 logout
1234