EasyManua.ls Logo

AUTOFLAME Mk7 - Page 8

AUTOFLAME Mk7
152 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3.10.2 Feed Water Valve Specification ................................................................................... 42
3.10.3 Bronze Liner .................................................................................................................. 43
3.10.4 Replacing the bronze liner ............................................................................................ 43
3.10.5 Feed Water Valve Sizing Calculations ......................................................................... 44
3.10.6 Flanged Feed Water Valve ........................................................................................... 45
3.10.7 Threaded Feed Water Valve ........................................................................................ 46
3.10.8 Replacing the Servomotor for a Feed water Valve ....................................................... 48
3.10.9 Storage, Operation and Maintenance ......................................................................... 50
4 TOTAL DISSOLVED SOLIDS MANAGEMENT ............................................................ 51
4.1 Philosophy of TDS Control System ........................................................................................ 51
4.2 TDS Probe Calibration .......................................................................................................... 52
4.3 Method of TDS Control ......................................................................................................... 56
4.3.1 Timing Diagram ............................................................................................................ 56
4.3.2 Continuous TDS Blowdown ........................................................................................... 57
4.3.3 Solenoid Valve TDS Blowdown .................................................................................... 57
4.3.4 Installation of TDS Probe Assembly .............................................................................. 58
4.4 TDS Probe and Autoflame Sampling Vessel ......................................................................... 59
4.5 Top Blowdown Adjusters ...................................................................................................... 60
4.6 Sample Routine ..................................................................................................................... 62
4.7 Relationship between Conductivity, Temp and TDS Values .................................................. 63
5 BOTTOM BLOWDOWN .......................................................................................... 64
5.1 Overview of Bottom Blowdown ............................................................................................ 64
5.1.1 Features and Benefits .................................................................................................... 64
5.1.2 Bottom Blowdown Time Reduction ................................................................................ 65
5.1.3 Bottom Blowdown Valve Drawings ............................................................................... 68
5.1.4 Front Facia and Dimensions .......................................................................................... 70
5.2 Bottom Blowdown Configuration .......................................................................................... 71
5.2.1 Bottom Blowdown Options ........................................................................................... 71
5.2.2 Commissioning Bottom Blowdown Module with M.M. ................................................. 75
5.2.3 Battery Test ................................................................................................................... 79
5.2.4 Bottom Blowdown Timer Configuration ........................................................................ 80
5.3 Commissioning Standalone Bottom Bl
owdown Module........................................................ 83
5.4 Bottom Blowdown Operation ............................................................................................... 87
5.5 Further Bottom Blowdown Time Reduction Savings Calculations .......................................... 90
5.6 Shunt Switch ......................................................................................................................... 96
5.6.1 Shunt Switch Philosophy ............................................................................................... 96
6 STEAM AND HEAT FLOW METERING ...................................................................... 97

Table of Contents

Related product manuals