EasyManua.ls Logo

Barco DP2K-19B

Barco DP2K-19B
125 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3. Physical installation
1
2
3
3
Image 3-11
Power loop through connection
2. Secur e both plugs o f the s hort cable with a xation spring (2). Handle as follow:
- Squeeze the xation spring together.
-Slidethexa t io n spring on the xation pins (3) while squeez ing together and push it against the power plug.
- Release the xation spring.
3.6 Connecting a UPS to the projector electronics
WARNING: On ly use UPS units wh ich are suitable for the B-series projector. S ee chapter ”General”, “Instal-
lation requirements” for more information about the requirements of the UPS.
How to connect the UPS
1. Install the UPS according to the instructions of the manufacturer a nd the local regulations.
2. C onnect the powe r output cord from the UPS unit to the UPS inlet s ocket of the projector (right s ocket).
Connect directly (A) or drag the cable behind the front cover so that the front cover can be removed w ithout removing the UPS
INLET cable (B).
24
R5905067 DPXK-19B/23B/P 17/09/2012

Table of Contents

Other manuals for Barco DP2K-19B

Related product manuals