Battery: 50 A
Fusible Link_002
1
Fusible link (50 A)
Towing
Towing The Machine in An Emergency
If the machine does not travel due to engine
trouble, etc., you can move it in the following
ways:
Pushing by hand
Towing (See the following procedure.)
Before towing, check that the brake is applied
effectively.
Before starting the engine, be sure to close
the unload valves.
Do not touch the unload valve except when
towing the machine.
When towing the machine, travel at a speed
no more than 3.0 km/h.
In addition, do not tow the machine for more
than 3 minutes.
If the towing speed is too fast or there is
excessive movement, the pump or motor will
be damaged.
・
・
The unload valves are located under the floor
panel.
Towing The Machine in An Emergency_001
Stop the engine.
Apply the parking brake.
Chock the wheels.
Secure the machine with ropes.
Front side
Towing The Machine in An Emergency_002
Rear side
Towing The Machine in An Emergency_003
Set the 2WD/3WD selector lever to the
"2WD" position.
1.
2.
3.
4.
5.
LM331
Repair
Page 7-6
Towing