Operation Manual Safety Module for b maXX 5000 BM5-O-SAF-000/-001
Document no.: 5.09013.07
APPENDIX B - CHECKLISTS
The use of checklists serves documentation purposes and guides in the implementation
of a safety system. The checklists reproduced in this chapter serve to prevent errors and
must be processed carefully for every project. It is also required to make copies of the
printed checklists.
No claim is made that the checklists are complete. There may be additional requirements
depending on the specific plant.
B.1 Planning checklist
Serial
no.
Requirement
Fulfilled
Remarks
Yes No
1 Planning
1.1 Has a risk assessment been carried out
and have the required SIL and
performance levels in accordance with DIN
EN ISO 13849-1 or IEC 62061 been
determined?
1.2 Are power supplies according to PELV
specifications being used exclusively?
1.3 Is the line routing carried out in accordance
with the applicable standards and
guidelines?
1.4 Is the electrical supply for the local I/O
terminals and field bus components
properly dimensioned?
1.5 Do all safety-oriented system components
meet the requirements of the established
SIL (IEC 61508), performance levels and
safety category (DIN EN ISO 13849-1)?