EasyManuals Logo

baxter AK 98 Manual

baxter AK 98
34 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #14 background imageLoading...
Page #14 background image
The procedure continues automatically with the priming phase:
4. Once the saline reaches the drain bag, increase the level of
the priming fluid in the venous drip chamber, while the pump
is turning, using the adjustment knob.
The level should be well above the air detector head.
5. When the blood pump has stopped, turn the dialyzer (red
end up).
CAMP/MG208/20-0006 AK 98 Independent Home Dialysis System 14
Priming the dialysis circuit – cont’d

Other manuals for baxter AK 98

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the baxter AK 98 and is the answer not in the manual?

baxter AK 98 Specifications

General IconGeneral
Brandbaxter
ModelAK 98
CategoryMedical Equipment
LanguageEnglish

Related product manuals