BELL HELICOPTER 430 - 5-15. 600 HOUR;ANNUAL INSPECTION (CONT)

BELL HELICOPTER 430
186 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
BHT-430-MM-2
5-00-00
Page 26 Rev. 15 26 JAN 2007
Chapter 65 b. Make sure the tail rotor splined adapter nut has the
correct torque.
BHT-430-CR&O-3 13. Make sure that the tail rotor blades attaching bolts/nuts
have the correct torque. (R2)
14. Inspect tail rotor blades pitch change bearings as follows:
a. Without removing the blade, clean exposed areas of
pitch change bearings.
BHT-430-CR&O-3 b. With the blade bolts torqued to the highest value of
torque range, visually inspect each bearing inner member neck
area (full 360°) for cracks. If crack(s) are found in a bearing,
replacement of both bearings in that blade is required.
BHT-430-CR&O-3 c. Visually inspect chamfered washers installed in direct
contact with the outboard surface of the yoke for deformation.
Deformed washers must be replaced.
Chapter 53 15. Remove the fairing cover plates and examine the wing(s)
to fuselage attach points for corrosion, looseness and damage.
Check torque of attaching bolts/nuts.
Chapter 53 16. Remove baggage compartment floor and examine the
following:
a. Examine surrounding aft fuselage structure for
corrosion and damage.
b. Examine wiring bundles for chafing. Make sure they are
correctly attached.
c. Examine the environmental control unit for general
condition. Make sure it is correctly attached. Examine bleed air
tubing connection for leakage. Make sure all tubes and
connectors are securely attached.
d. If installed, examine auxiliary fuel system components,
wiring and tubing for corrosion, chafing and correct attachment.
SCHEDULED INSPECTIONS
5-15. 600 HOUR/ANNUAL INSPECTION (CONT)
DATA REFERENCE INSPECTION TASK DESCRIPTION
INITIAL
MECH OTHER