BHT-430-MM-2
5-00-00
26 JAN 2007 Rev. 15 Page 49
SCHEDULED INSPECTIONS
5-21. PROGRESSIVE INSPECTION — EVENT 6
DATA REFERENCE INSPECTION TASK DESCRIPTION
INITIAL
MECH OTHER
DATE: __________________W.O. ____________________
FACILITY: _________________________________________
HELICOPTER S/N: __________________________________
REGISTRY NO.: ____________________________________
TOTAL TIME:______________________________________
SIGNATURE:_______________________________________
GENERAL:
Paragraph 5-13 1. Do a complete 50 hour inspection.
DETAIL:
Chapter 96 1. Examine the condition of the electrical and avionics
components in the nose compartment. Make sure they are
correctly installed. Examine the electrical harnesses and cables
for frayed wires and loose or broken clamps and fasteners.
Chapter 52 2. Examine the nose compartment door for damage. Make
sure it latches correctly. (F1/F2)
Chapter 95 3. Examine the pitot tubes. Make sure they are correctly
attached. (F1/F2)
Chapter 52 4. Examine the crew doors, passenger doors and baggage
compartment doors for damage or corrosion. Examine the
positive locking mechanisms. Examine the door seals for tears
or separations. Make sure the doors are correctly attached to
the airframe structure. (F1/F2/F3/F4)
Chapter 25 5. Examine the seat cushions and seat backs for tears and
deterioration. Make sure they are correctly attached. (F1/F2/F3/
F4)
Chapter 25 6. Examine the seat assemblies to make sure they are
correctly attached to airframe structure. (F1/F2/F3/F4)