4 INSTALLATIN AND COMMISSIONING
After assembly, installation and commissioning of the inverter system, all
components are ready for operation. No additional settings and
adjustments are necessary.
The safety instructions must be observed at all times
during assembly, installation and commissioning.
The site chosen for the inverter system must have a solid and level floor.
The inverter system is designed for operation in a restricted access, dry
environment. The maximum ambient temperature is 40°C. Attention must
be paid the inverter system is not exposed to air borne containments and
the flow of cooling air is not hampered.