TEBEVERT III INVERTER SYSTEM (120 VDC)
07.11.2011 42 028-0009-006
Fig. 16: LED states of the inverter (normal operation)
5 PERFORMANCE TESTING
The following load test is recommended by a Benning technician.
5.1 PRELIMINARIES TO PERFORMANCE TEST
The site manager must be informed of the test to be performed, and that
alarms will be sent (if connected) to the central alarm center or Network
Operations Center.
Read all of Section 5, make sure you know where to find all the buttons
and other referenced items.
Warning!
During the performance test, pay attention to all safety
notes located in Section 1. In addition, these inverters
may be fed from multiple power sources, so additional
precautions must be taken.
Take off rings, wristwatches and similar objects that may cause short-
circuits.
Always use ESD-protection for any work to be carried out inside the
cabinet.
When the inverter operates as
the master, this LED flashes.