This manual covers installation and operation of the following products:
#086-250 Atomlab 100 Dose Calibrator (115V)
#086-258 Atomlab 100 Dose Calibrator (250V)
Prior to making activity measurements after a preset Dial Value has been
changed on ANY isotope selection key, all Atomlab model Dose Calibrators must
be power cycled; i.e., the Dose Calibrator power switch must be turned OFF and
then back ON. Failure to power cycle after changing any preset key may cause a
measurement ERROR on any or all isotope keys.
ATOMLAB 100 DOSE CALIBRATOR