Page #90 background imageLoading...
Page #90 background image
Монтаж и пуск INGENIO COMPACT ИБП 10÷20 кВА
Installation and start-up of INGENIO COMPACT 10÷20 kVA
70 OMS90050 РЕД. / REV. A
Picture 15 – Inverter start-up
8) Close the OUTPUT switch to supply power to the load.
Picture 16 – Start-up completed
5.2.2 COLD START
The COLD START allows the UPS start-up directly from the battery supply.
Check battery polarity
Before proceeding with the COLD START carefully check that the battery is properly
wired and polarity is correct.
1) Open the front door the access the switches / isolators.
2) Close the battery fuse (or the external battery isolator) and wait for the display to start.
3) Close the power supply fuse.
4) Select Command Operation Cold start precharge ready on the display.
5) Select Normal Mode to start the UPS and proceed as indicated at the previous
paragraph.
6)

Table of Contents

Other manuals for Borri INGENIO COMPACT

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Borri INGENIO COMPACT and is the answer not in the manual?

Borri INGENIO COMPACT Specifications

General IconGeneral
BrandBorri
ModelINGENIO COMPACT
CategoryUPS
LanguageEnglish

Related product manuals