EasyManua.ls Logo

Bosch CL400 - ZS400 Start-up

Bosch CL400
143 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Flexible Automation
Central processing unit ZS400
4-30
1070 072 143-101
4.6 ZS400 startup
If the startup conditions are not fulfilled after switching on the power supply
module, the ZS400 switches to startup/stop, i.e. after switching to Run a
cold start is performed.
If a battery failure occurs in battery operation, or the ZS400 was unplugged,
no startup can take place; error message
. Startup is performed once
the battery failure is acknowledged and the PLC program is loaded.
Startup is then carried out independently of the setting of the retention
switch as a first start.
Setting Software switch S114:
D 0000H PLC program in internal RAM memory is valid
D 0001H PLC program on the memory card is valid
Yes
No
Power
On
ZS400
Stop
Battery
operation
Battery
failure
Memory card
inserted
Setting
S114
NoYes No
Yes
No
Yes
Stop
Stop
First start,
Run
Startup/
stop
Yes
No
0001H
0000H
Stop
First
start
No
Yes
First
start
Startup/
stop
0000H
First
start
0001H
Fig. 4-22 ZS400, Startup

Table of Contents

Related product manuals