ENGLISH 33 / 77 CAP. 7 - INSTALLATION
M
ULTIGAS
R
emove the equipment from the pallet (2 operators required)
3) Lift both front wheels by levering with the
front handles and on rear wheels (this way the
operators must not lift the full weight of the
unit)
4) Slowly lower the unit from the pallet by
means of the rear wheels
Keep the pallet, carton and scratch protection film for use when returning the unit. The unit rolls
on wheels; the two smaller wheels can be locked.
MULTIGAS 8500 PLUS is supplied with the accumulation tank empty. This prevents problems in
shipping the unit.
GAS SCALE SCREW RELEASE
The tool is transported, with the scale blocked by a locking screw to avoid the load cell damage.
The scale locking screw is placed on the tool bottom (see the box shown above) and is formed by
a bolt with wing-nut. For commissioning, slacken the wing-nut, unscrew the screw by 4 mm from
the fixing ring nut and fix the wing-nut again.