ENGLISH 35 / 77 CAP. 8 - COMMISSIONING
M
ULTIGAS 8500 PLUS
ATTENTION: Leave the quick coupling taps closed when the unit is not in use
and at the end of vehicle service operations.
8.1.2 FIRST TANK FILLING
Execute the following actions in sequence by following the display guided procedure and the
illustrations on the summary sheet provided with the equipment:
• Gas weight check
• Oil weight check
• Pressure check
• First tank filling
It is possible to interrupt the initial check and print a report with the equipment printer in which the
checking status is reported.
The equipment cannot operate in automatic mode until all the steps of the initial check have been
completed.
CAREFULLY ABIDE BY THE FOLLOWING
INSTRUCTIONS TO AVOID DANGER TO
PERSONS, THE DISCHARGE OF
REFRIGERANT IN THE ATMOSPHERE
Let us consider as first filling the one carried out during the initial check with internal tank of the
equipment free of refrigerant gas and containing air.