ES Industrial Range
Product Manual V3.3
© Copyright Brainboxes Ltd Page 16 of 53
6. During the device installation you will see a timer symbol and the status of the device will
be ‘Installing driver…’
7. Once the device is installed a pop up box will appear saying ‘Your new hardware is
installed and ready to use.’
8. In Boost.LAN Manger, the device will display a blue tick symbol showing that it’s installed
and the status of the device will be ‘Ready’. The device will also have moved to the
‘Online – Device Installed’ section in the main window of Boost.LAN Manager.
9. You can check the COM Number of the port by following the instructions in the section:
Finding your Brainboxes COM port If you need to change the COM port number, see
Changing Your COM Label