EasyManua.ls Logo

Brewer Science Cee 200X - Environment; Unpacking and Inspection; System Installation and Setup

Brewer Science Cee 200X
38 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
11
4.4.2 Environment
The Cee
®
200X spin coater should be operated in a clean, low-humidity environment.
4.4.3 Unpacking and Inspection
Thoroughly check the equipment for shipping damage. If physical damage is seen,
DO NOT APPLY POWER! Contact Brewer Science Equipment Customer Support
immediately.
The following items should be included with the shipment:
One (1) Cee
®
200X spin coater unit
One (1) power cord with female power connector
One (1) anodized aluminum stylus
One (1) operator/user manual
The following optional items may be included:
Spin chuck with screws
Dispense controllers
Dispense valves
Dispense nozzles
Dispense hubs
4.4.4 System Installation and Setup
1. Lift the unit out of the packing crate by grasping the bottom only. Do not lift the
unit by any of the top covers or protrusions. Do not roll or turn the unit on its side
or ends.
2. Remove plastic wrap and packing foam.
3. Place the Cee
®
200X spin coater on a table of proper height and strength so that
the controls and spin chuck are at the proper ergonomic height.
4. Level the machine using the feet so that the spin chuck is level from front to back
and side to side.
5. Thoroughly clean the spin bowl and spin chuck.
6. Connect vacuum, N
2
, drain, and exhaust lines.
7. Plug in the machine.
8. Once the unit is plugged in, only the cooling fan should be powered, not the
display.
9. Switch the ON/OFF power switch to ON.
10. The display should momentarily show a boot screen and then show the main
screen. Please be patient to allow the booting process to complete.

Table of Contents