EasyManua.ls Logo

BRP Evinrude E-Tec 300 - Gearcase Housing Inspection; Pinion Gear Removal and Driveshaft Servicing; Shift Housing, Gear and Propeller Shaft Removal

BRP Evinrude E-Tec 300
416 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
320
GEARCASE – COUNTER ROTATION
GEARCASE HOUSING INSPECTION
Remove propeller shaft, forward gear and bearing
housing assembly from gearcase.
Pinion Gear Removal and
Driveshaft Servicing
Refer to Pinion Gear and Dri veshaft Removal
on p. 298.
Shift Housing, Gear and
Propeller Shaft Removal
Push down on the shif t rod. This will move the
detent lever downward to clear the inside of the
gearcase when t he sh aft assembly is pulled o ut.
Unscrew the shif t rod from the dete nt lever .
Remove scre ws, cover , an d shif t rod from the
gearcase.
Discard the cover gasket. Remove the shift rod O-
ring from inside of cover and discard.
Use an app ropriate tool to apply downward pres-
sure on the dete nt wh ile pulling on the pro peller
shaft assembly. Remove propeller shaft assembly
from the gearcase.
Water Intake Screens
Remove and clean water intake screens. Replace
if damaged.
GEARCASE HOUSING
INSPECTION
Refer to GEARCASE HOUSING INSPECTION on
p. 301.
006850
1. Cover gasket 006884
1
Counter Rotation Models
1. Tool
006929
1. Water intake screen 006886
1
1

Table of Contents

Related product manuals