Maintenance, Lubrication schedule – P2
Maintenance schedule
Order number Date Valid from serial number T-code
226057-040 2005-09-23 914369- 675
© BT Europe AB Service Manual LWE130 3- 3
2 = Retighten securing bolts to 45 Nm every 12 months.
3 = The drive gear is replaced when its diameter is < 235 mm. Drive
wheel bolts are retightened every 12 months to 20 Nm.
4 = Check for leakage when changing the grease for the first time.
5 = The oil is changed and the filter cleaned for the first time after 12
months, and then every 24 months
When points with higher hour intervals are carried out the points with
lower hour intervals should also be carried out unless otherwise speci
-
fied above.
5400 Power system
5400.1 Cleaning and checking of mounting in chassis C/T
5400.2 Re-tighten cable connections T
5400.3 Check the cable insulation I
5700 Electronic circuit board
5700.1 Check connectors and cables T
6100 Hydraulic system
6100.1 Check hoses and connections for wear I
6100.2 Check hoses for wear and damage I
6100.3 Check the oil tank for cracks, leakage and damaged
mountings
I
6100.4 Check that the oil level is correct I I
6100.5 Change the oil and clean the filter
L
5
6600. Lift cylinder
6600.1 Check for leakage I
6600.2 Check the mountings I
I: Inspect, correct and replace if necessary. T: Tighten C: Clean L: Lubricate
M: Measure, correct if necessary
Pos.
no.
Work to carry out
Interval in days/weeks/months - may vary due to
application
1 d 1 w 12 m 36 m
https://www.besttruckmanuals.com/