Bucher Municipal
V Range
89
Optional Equipment
V50 • V65 • V80 Operator’s Guide
Recirculation Flushing During Operation
An optional tap located on the Supawash manifold enables the body transfer duct to
be flushed through at high pressure.
With the re-circulation switch off and the Supawash activate, the high pressure water
will back flush the transfer duct into the body and expel the dirt through the large ball
valve on the rear door if opened, or into the body.
With the re-circulation switch on, the pipework from the transfer duct to the nozzle
can be flushed out at the same time.
This feature allows a first fill of an additional 750 litres of water to be carried within the body, which
can be re-circulated back to the body allowing longer on station working. In dry conditions the body
should be filled with water via the offside hydrant filler to the level of the tap (A) on the rear door.
Operating the switch (C) will allow this water to be re-circulated via the nozzle whilst sweeping.
WATER RECIRCULATION
1. Open the de-watering valve (B) on the bottom of the rear door.
2. Lower the nozzles and activate the re-circulating water switch.
3. Thoroughly clean the door meshes and the ducting through the body.
Failure to carry out this procedure could lead to blockages in the water ducts.
After Load Discharge
CAUTION
Do not use at temperatures below 5°C as the water could freeze in the inlet duct.
NOTICE
The water recirculation option now includes the Easiclean feature as standard.