8 Installation
6 720 646 864 (12/2010) – Technical guide Logano GE315, GE515 and GE615
73
Fig. 60 Standard delivery
1 Pull rod (2 pce)
2 Extension (6 pce)
3 Compression unit (2 pce)
4 Additional flange (4 pce)
5 Mating flange (diameter of the hole circle Ø 135 × 25)
(2 pce)
6 Wedge (2 pce)
– Patent ratchet (2 pce)
8.7.7 Installation aid for cast iron boilers
The installation set for oil/gas fan-assisted boilers is used
for on-site installation of the boiler sections for the boiler
series Logano GE515, GE615 and Logano plus GE515,
GE615. With the installation set, boiler sections can be
safely anchored on site.
The installation set is fastened to the rear boiler section,
stabilising it ready for the installation of further boiler
sections.
Fig. 61 Rear section of a Logano GE515 positioned
using installation aid; rear view
6
5
4
3
2
1
6 720 644 097-58.1il
6 720 644 097-59.1il