EasyManua.ls Logo

Bunn Premia - Support; BUNN Supporthub; Site Requirements; Plumbing

Bunn Premia
48 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6
continued >
SITE REQUIREMENTS
SUPPORT
Plumbing
1. No Chlorine.
2. Water hardness 6 to 10 grains or less total hardness.
3. Water Filtration System:
Counter
Machine must be level within 2˚ for proper operation.
Counter must be a sturdy, level surface able to
support 300 lbs.
FOR INDOOR USE ONLY
WARNING
The brewer must be disconnected from the power
source until specified in Initial Setup. Refer to Data
Plate on the Brewer, and local/national electrical
codes to determine circuit requirements.
Brewer must be connected to a cold water system with operating pressure between 30 and 90 psi
(0.206 and 0.620 MPa) from a 0.5 inch or larger supply line. Install a regulator in the line when pressure is
greater than 90 psi (0.620 MPa) to reduce it to 50 psi (0.345 MPa).
NOTE: Bunn-O-Matic recommends .375 inch copper tubing for installations of less than 25 feet and
.375 inch for more than 25 feet from the 0.5 inch water supply line. A tight coil of copper tubing in the
water line will facilitate moving the brewer to clean the counter top. Bunn-O-Matic does not recommend
the use of a saddle valve to install the brewer. The size and shape of the hole made in the supply line by
this type of device may restrict water flow.
56000.0025 - SYSTEM, WEQ-25 (2) .2L
56000.0123 - CARTRIDGE, WEQ-25 (2) .2L
For best results include:
Water Treatment
BUNN SupportHub provides easy access to
comprehensive information and resources tied to
the specific serial number for this product. Scan
the QR code with any smart device for access
to manuals, product information, training videos,
service support and other related information.
TM
BUNN SupportHub

Related product manuals