EasyManua.ls Logo

Bunn Premia - Plumbing Hook up; Drain Hook up

Bunn Premia
48 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
9
3
1
Drain Hook Up
5. For Through Counter drain hook up; use the
included 90˚ Elbow Fitting (PN 38553.0001)
to route hose down, through the counter.
Plumbing Hook Up
The plumbing connection is a .375 inch male flare
fitting located on the lower, left, rear of the
machine as shown.
NOTE: Water pipe connections and fixtures
directly connected to a potable water supply
shall be sized, installed, and maintained in
accordance with federal, state, and local codes.
1. Main water supply shut off valve should be
present between water supply and machine.
2. Place Nylon Gasket (find in separate bag) into
end of water line as shown. (PN 33149.0000)
3. Flush the water line and securely attach it to
the inlet fitting at the rear of the brewer.
4. Turn on the water supply and check for leaks.
INITIAL SETUP
Counter Top
As directed in the International Plumbing Code of the
International Code Council and the Food Code Manual of
the Food and Drug Administration (FDA), this equipment
must be installed with adequate back flow prevention to
comply with federal, state and local codes. For models
installed outside the U.S.A., you must comply with the
applicable Plumbing /Sanitation Code for your area.
1. The drain connect is a barb fitting located at the
back, right leg.
2. The drain hose must be rated to withstand
temperatures of 200˚F (93.3˚C).
3. Installation of drain hose must be gradually
sloped and routed without any kinks or rise in
the tubing going to the nearest open drain.
4. Site drain should be rated to withstand
temperatures of 200˚F (93.3˚C).
continued >
5
1
3
2
NOTE: A hole in the counter or path must be
available for routing water supply line, drain line,
and electrical cords from the machine to the site
connections.

Related product manuals