CommissioningCommissioning
CommissioningCommissioning
Commissioning
Check that unit has been properly installed (in
compliance with DIN 1988, Part 4).
Use AQUATEST to measure and record the
hardness of the drinking water before it enters the
soft water unit.
Brine preparationBrine preparation
Brine preparationBrine preparation
Brine preparation
Remove protective hood (2).
Fill the storage chamber
with max. 50 kg of with max. 50 kg of
with max. 50 kg of with max. 50 kg of
with max. 50 kg of
regenerantsregenerants
regenerantsregenerants
regenerants (salt tablets complying with DIN EN
973 type A, e.g. Clarosal or Sanisal/Sanitabs) (
33
33
3).
The brine chamber (
66
66
6) is automatically filled with
drinking water during commissioning.
N.B.: N.B.:
N.B.: N.B.:
N.B.: If a major soft water withdrawal is envisaged
after commissioning, it should be noted that the
unit requires about three hours for brine to form.
Insert mains plug.Insert mains plug.
Insert mains plug.Insert mains plug.
Insert mains plug.
Water supply must remain off.
The display shows the
start screen start screen
start screen start screen
start screen with the
version number.
Let basic fixing take place.Let basic fixing take place.
Let basic fixing take place.Let basic fixing take place.
Let basic fixing take place.
The running noise stops after about 40 sec.The running noise stops after about 40 sec.
The running noise stops after about 40 sec.The running noise stops after about 40 sec.
The running noise stops after about 40 sec.