Canon imagePRESS Lite C170 Series Service Guide
imagePRESS Lite C170 Series Service Guide March 2022
Revision 11 Page 75
Q. Periodically Replaced Parts
Some parts of the machine must be maintained and replaced periodically to
ensure a specific level of machine performance. These parts can affect the
performance of the machine once they fail, even if there is no external change
or damage. Whenever possible, plan to replace these parts during a scheduled
service visit.
Table 40 – Main Unit Periodically Replaced Parts
Estimated life
based on letter
size paper
Primary Charging Dustproof Filter
Primary Charging Assembly
Pre-transfer Charging Assembly
Primary Charging Wire Unit
Specified
by the
running
distance in
charged
state
Primary Charging Wire Cleaning Pad
Slider
FL2-7750 1 400,000 pages
Primary Charging Wire Cleaning Pad
Holder
FL3-7560 1 400,000 pages
Pre-transfer Charging Wire Unit
Pre-transfer Charging Wire Cleaning
Pad Slider
FL2-7750 1 400,000 pages
Pre-transfer Charging Wire Cleaning
Pad Holder
FL3-7560 1 400,000 pages