12
Cable Connections
1. Plug the power cord of the power conditioner into the appropriate electrical outlet. Turn the power
conditioner on, confirming it is working by the green light on the front of the conditioner.
2. If using a SMART 6 for moisture analysis, first refer to the SMART 6 Operations Manual for installation
and setup of the SMART 6.
3. Once installed, plug the SMART 6 power cord into the power conditioner. Wait until connecting all
ORACLE cables to connect the SMART 6 to the ORACLE processor box via the supplied green Ethernet
cable, then proceed with powering the SMART 6 on.
4. Following steps 5-16, carefully connect each cable provided in the cable kit and accessory kit. Ensure
that each cable is connected properly. Use caution to prevent bending or damaging the pins of the
connectors.
5
. Connect the BNC cable to the processor box and magnet.