EasyManua.ls Logo

CEM ORACLE - Page 22

CEM ORACLE
81 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
18
16. Connect the Power cords to the ports on the back of the magnet and processor box. Plug both
cords into the Power Conditioner, then turn the green switch on the processor box to the ON
position.
FOR SMART 6 USERS ONLY
After following instructions to install the SMART 6 system in the SMART 6 manual, connect the SMART 6 to the
ORACLE analyzer with the CAT5 Ethernet cable provided as illustrated below.

Other manuals for CEM ORACLE

Related product manuals